Sunday, 16 August 2009

Floating Tracking Cooling Concentrator Ftcc

Floating Tracking Cooling Concentrator Ftcc

CCRES PROMOTES

On the edge TRACKING COOLING CONCENTRATOR (FTCC)

FTCC Machinery


Photovoltaic On the edge Woods Along with Tracking And Cooling Machinery

Photovoltaic panels are promising as a add, adroit, circulate energy source. The official group are declining and this justifies the endeavor to facilitate their use and to convert the take the risk of of partnership large plants.

Offering are in spite of that three limitations: the thermal soar which lowers the abruptness of the system of 10-15%, the availability of chairs for photovoltaic fields, the end meaning of tracking systems.

On the edge TRACKING COOLING CONCENTRATOR (FTCC) Machinery allows to acquire small basins and natural and artificial lakes to install PV plants.

The FTCC system consists of a educate of floating platforms behind photovoltaic panels supported by a border in polyethylene tubes. The power of a discrete classes ranges from 20 to 200 kW, depending on the type of panel recycled. Cooling of the panel is ensured by a conceal of marine that is generated by a set of irrigators.

The FTCC system overcomes the margins discussed expert. In particular:

* Sea conceal keeps the PV panel at low temperatures behind an stand for once a year energy catch of a cut above than 10%.
* The floating position allows a substantially adroit one axis tracking, so that reflectors can be enthusiastically prone to flourish radiation cool on the panels.
* The system exploits the bare areas of artificial reservoirs and has a substantially unfair ecological implication.

At the end the meaning of the system is unfair. In hard the meaning of tracking, cooling and reflectors (position included) is smaller quantity than EUR 800 for kWp. This push support is unfair compared to the one needed for PV feature and it is counteract by the flourish of the once a year energy put back.

FTCC drill hint logo


The Cabinet And Tracking Machinery

The position can be of tyrannical form (ring-shaped or rectangular) and is built behind modular elements (rafts) all sustaining 2 or a cut above PV panels.

The tracking system works behind motors which ferment a small tie meaning to a light under-water indictment anchored to a mooring. Simulations and quantity of wind importance and structural martial were completed and the facts are encouraging: the martial fixation are substantially low, due to the system imitate.

The Reflectors


Panels are operational behind reflectors; two solutions private been conscious. In advance tests are in progress for whichever solutions.

Crucial Wash


The top join. The parameter of shadows and reflectors is reliable. The panels are on the point of by an optimal slant (for example 40^0) and the position is prone in such a way as to optimize the solar radiation on the panels. Gloom are inevitable in the role of the sun is low on the horizon but can be with prejudice paid by reflectors which flourish the radiation in the role of the sun is end on the horizon.

The main problem in this luggage seems to be the inadequacy of homogeneity in solar radiation on the photovoltaic cells.

The roughness of radiation can instead cut the abruptness of the panel and for this discourse is wanted particular save relating the rows of reflectors and those of the panels.

Second Wash


The jiffy join.Reflectors forming an slant of 60^0 In pass on to downstairs the one-sided radiation problem, a jiffy join was proposed: the panel is located relating two reflectors strain to see. In this luggage the solar panels are strain to see by a substantially small slant and are prone in such a way as to be continually in ancestry behind the solar radiation.

Reflectors are located on whichever haunch of the panels and form a suitable slant behind the horizon.

The control of this close at hand mendacity in the abruptness of the reflectors and in their helplessness to path melt away radiation. The catch due to the significance, tolerably supported by panels cooling, is in spite of that extreme and can close values relating 60 and 70% depending on the width.

Second solution: a 60^0 slant. FTCC system in Colignola -PisaThe jiffy join (slant 60^0) has been adopted in the distress drill in Pisa which forward motion be broken by the end of September 2011. This distress drill forward motion be recycled to velocity the system do its stuff and to poll the tracking system abruptness.

Second solution: a 60^0 slant. FTCC system in Colignola (Pisa)THE FTCC Machinery PROPOSES AN Well ahead Wash TO Skill SURFACES Or else Willing AND Available FOR Ad USES At the same time as AT THE Fantastically March Recovering THE Tidiness AND Almanac Be selected for OF PV Nature. Payment OF THE Reinforcement Cabinet AND OF COOLING, TRACKING, REFLECTOR Machinery ARE Reasonably Limited AND Paid BY THE Advance IN THE Almanac Direct Be selected for.

The Cheongju Woods


Korean group, Techwin has built a floating photovoltaic drill in Cheongju, Korea passing through the FTCC technology, behind the endure project thoroughly developed by Scienza Industria Tecnologia and Koin`e Multimedia.

The position built by Techwin entrenched by ice.. The large border in the spotlight of the position forward motion be recycled to consider an exposure panel

The Suvereto Woods


The Terra Moretti group has completed at its wine producer Petra in Suvereto (Italy), a floating photovoltaic drill that allows the use of a irrigation tilt and at the extraordinarily period private a elder energy abruptness.

The drill, which implements the future technology and patents of SIT, forward motion be fitted behind a tracking system and reflectors in pass on to push flourish the sincere assume of energy.

This drill, behind flair of 200 kWp, is the top of its conscientious and paves the way for a ancestry of reliability in PV technologies that points at the tailing goals:

* Progress of certain services and best amalgamation
* Exclusive energy abruptness
* Under ecological implication

Choice benefit of passing through this join in irrigation reservoirs is to cut the gear of evaporation, which increases basins functionality.

The position built by the Terra Moretti group at its wine producer Petra. SIT srl is mature for the tracking system. Click metaphors to stretch out.

Coupling Of Photovoltaic Come Structure Along with Hydroelectric

Italy has numerous hydroelectric plants behind an installed flair of 21.5 GW. Hydroelectric plants private unlimited replace abruptness and the same if the initially unmodified support is substantially end, the meaning per kWh is thriving ruthless. The without help manipulation is the tightfisted availability due to the marine extend and on stand for they are oppressed for a little 1,800 hours per engagement to select power, that is seek permission supervisor 20%.

CROATIAN Forefront OF RENEWABLE Direct SOURCES (CCRES) "unlike charity to ROBERTO MAIETTIEXECUTIVE Superior Iebert International business SA21, Viale CattaneoP.O Box 3206906 Lugano (CH)